Joint construction project led by the Florida Department of Environmental Protection, administered by Community Redevelopment Agency and construction managed by the Engineering Department. This project used NRDA funding from BP.
Construction on a 2.82 acre parcel for a public boat ramp to include a three-lane boat ramp; large public gazebo, portable toilet facility, various sized parking spaces to accommodate a wide range of water craft, tie down area, sanitary pump-out station, and an educational kiosk. Many eco-friendly materials/products were used including pervious concrete for the parking area, sanitary pump-out station and an oil/water separator drain system to capture bilge water from trailered boats. The project included reconstruction of Mahogany Mill Road with drainage improvements and sidewalks for public access to the site. |